Chinatown MRT station

Coordinates: 1°17′06″N 103°50′38″E / 1.2849°N 103.84396°E / 1.2849; 103.84396
From Wikipedia, the free encyclopedia

 NE4  DT19 
Chinatown
牛车水
சைனாடவுன்
Mass Rapid Transit (MRT) interchange
Photograph of station entrance at ground level on Pagoda Street. The entrance, surrounded by shophouses, is enclosed with a transparent roof, with two white pillars supporting the roof. A sign over the entrance indicates the station's name and alphanumeric code (NE4/DT19).
Exit A of Chinatown MRT station
General information
Location
  • 151 New Bridge Road, Singapore 059443 (NEL)[1]
  • 91 Upper Cross Street, Singapore 058362 (DTL)[2]
Coordinates1°17′06″N 103°50′38″E / 1.2849°N 103.84396°E / 1.2849; 103.84396
Operated bySBS Transit Ltd (ComfortDelGro Corporation)
Line(s)
Platforms4 (1 island platform, 2 side platforms)
Tracks4
ConnectionsBus, taxi[3]
Construction
Structure typeUnderground
Platform levels2
ParkingYes (Chinatown Point, People's Park Centre, People's Park Complex)
AccessibleYes[3]
Other information
Fare zone1
History
Opened
  • 20 June 2003; 20 years ago (2003-06-20) (North East line)
  • 22 December 2013; 10 years ago (2013-12-22) (Downtown line)
ElectrifiedYes
Previous namesPeople's Park
Services
Preceding station Mass Rapid Transit Following station
Outram Park
towards HarbourFront
North East Line Clarke Quay
towards Punggol
Telok Ayer Downtown Line Fort Canning
towards Expo
Location
A map of the Singapore rail system, with a color for each line and a red dot highlighting the location of Chinatown station in central Singapore.
A map of the Singapore rail system, with a color for each line and a red dot highlighting the location of Chinatown station in central Singapore.
Chinatown
Chinatown station in Singapore

Chinatown MRT station is an underground Mass Rapid Transit (MRT) interchange station on the North East (NEL) and Downtown (DTL) lines in Outram, Singapore. It serves the ethnic enclave of Chinatown. Situated at the junction of Eu Tong Sen Street, New Bridge Road and Upper Cross Street, the station is near several landmarks, including the Buddha Tooth Relic Temple, Masjid Jamae (Chulia), Chinatown Point and People's Park Complex.

First announced as People's Park MRT station in March 1996, the NEL station was one of the most challenging projects undertaken during that line's construction. It involved multiple diversions of the main roads and the Eu Tong Sen Canal, in addition to the preservation of the Garden Bridge. The NEL station was completed on 20 June 2003. In March 2007, it was announced that the NEL will interchange with the DTL at this station. The DTL platforms of the station opened on 22 December 2013 as part of Stage 1 of the line.

Each of the six entrances has glass structures, with the Pagoda Street entrance having a pavilion-style transparent roof structure and the DTL entrance having an elliptical shape. The station features two artworks as part of the MRT network's Art-in-Transit programme. The NEL concourse and platforms feature calligraphy as part of The Phoenix's-Eye Domain by Tan Swie Hian, while the DTL concourse walls feature artworks of clothes lines as part of Flying Colours by Cheo Chai Hiang.

History[edit]

North East line station (1996–2003)[edit]

Underground platforms of the NEL, with calligraphic writing on the floor at the left
NEL platform level

Chinatown station was first announced as People's Park station, along with the 15 other North East line (NEL) stations, by Communications Minister Mah Bow Tan on 4 March 1996.[4][5] The contract for the design and construction of the station – Contract 709 – was awarded to a joint venture between Gammon Construction and Econ Piling in June 1997 at S$141.5 million (US$152 million in 2022).[6][7]

The construction of the NEL station was one of the most challenging projects on the line. Arterial roads like New Bridge Road, Eu Tong Sen Street, and connecting streets had to be rerouted, closed and reinstated several times. These closures took place through seven major phases and numerous sub-stages from December 1997 to March 2002. The bus stops had to be shifted accordingly.[8] As a result of the rerouted roads and the construction barriers, pedestrians had to take longer routes around the construction site to their desired destinations.[9] In addition, businesses in the area were affected by the noise and construction dust, leading to tarnished goods and a decrease in patronage.[10][11] The contractors made efforts to minimise these effects, such as using quieter machinery and cleaning the vehicles exiting the worksite. During the Lunar New Year in 2001, a temporary bridge was constructed to connect the two sides of Pagoda Street so pedestrians could walk over the entrance work site.[9]

Following engagements with the local community, the Land Transport Authority (LTA) implemented measures such as shifting worksite hoarding aside to maximise walking space, working with artists to paint the worksite panels, minimising the worksite space at Pagoda Street and renovating the Garden Bridge[a] to allow its integration with the station.[9][13] A temporary taxi stand was installed at Upper Cross Street to serve the retail development of Chinatown Point. The LTA also built a temporary pedestrian staircase from the shops along New Bridge Road to the Garden Bridge.[11][14]

Prior to the construction, the utilities at the site had to be diverted at a cost of S$7 million (US$7 million in 2022) so the utilities were not damaged during the station's construction. The utilities had to be protected or substituted during the manoeuvre, and took some time due to the poor documentation of the location of the old pipes and cables.[8] The Eu Tong Sen Canal running through the station site had to be dismantled and diverted into four 300 m (980 ft) steel pipes to connect the unaffected parts of the canal.[11] It was planned to use steel beams to support the canal during ground excavation and the station's construction,[12] but this would risk damaging the canal, causing the site to flood. The more time-consuming and expensive alternative to divert the canal into the 2.1 m (6.9 ft) diameter pipes would minimise such risks and allow sufficient space for the construction machinery. The LTA engineers decided to implement this alternative, which became one of the largest drainage diversion projects in Singapore. The pipes were suspended below the temporary road decking. After the station's construction, the canal, now wider and deeper, was rebuilt above the station.[15]

The Garden Bridge spanning over the roads of Eu Rong Sen Street and New Bridge Road
The Garden Bridge (pictured in 2018) was underpinned during the construction.

The construction also involved the preservation of Garden Bridge as it is a social and cultural landmark in Chinatown. Initially, there were plans to dismantle the bridge due to the columns and foundations being in the way of MRT works,[12] but the LTA reversed its decision and decided to underpin the bridge using massive steel trusses. Certain sections of the bridge's central support were cut away to allow more space for efficient excavation and construction. The support columns were rebuilt after the station's completion.[15]

Due to the soft marine clay above the stable sedimentary soil, there were a few cave-ins at the site during construction. On 3 July 1999, an unused section of the old canal caved in, forming a hole three metres (9.8 ft) deep. Several I-beams, a compressor and a small machine, which fell into the hole, were retrieved using a crane. It was discovered that some soil had seeped through a gap in the perimeter wall of the station, resulting in the collapse of the structure. The gap was made to accommodate a sewer pipe.[16] In the evening of 22 November, a section of Eu Tong Sen Street collapsed, and it was closed along with neighbouring streets. The collapse formed an eight-by-five-metre (26 by 16 ft) hole with a depth of up to one metre (3.3 ft). Nobody was injured and the surrounding buildings remained intact.[17] On 2 December that year, a two-centimetre (0.79 in) depression, along with cracks, was discovered on the road 15 metres (49 ft) away from the cave-in site, resulting in another road closure. It was found during an inspection of soil movement above the tunnelling machine underneath the street. One of the lanes remained open for buses.[18] The road was dug open to inspect the utility pipes, cables and the two steel pipes underneath the road. Cement was pumped into the ground to stabilise the soil before the road was reopened to traffic on 5 December.[13][19]

By mid-2002, the major roads were reinstated with most of the construction work complete.[11][20] In conjunction with the station's opening, the surrounding shopping complexes People's Park Complex and the OG Shopping Centre underwent renovations and redevelopment. The former Majestic theatre near the station had also been refurbished and converted into a retail mall.[9][11][21] With the NEL commencing services on 20 June 2003,[22][23] it was expected that the station would bring further development to the area with more investments and crowds.[7]

Downtown line station and further plans (2007–2013)[edit]

A map showing the Marina Line plans as announced in October 1997. The line, coloured in orange, has five branches connecting to (clockwise from north) Kallang, Paya Lebar, Tanjong Pagar, Chinatown and Dhoby Ghaut. The Kallang and Paya Lebar branches converge into one branch, before branching out again into three branches to Tanjong Pagar, Chinatown and Dhoby Ghaut
Map of the planned Marina Line
A part of the road has been blocked off with road barriers. Two cranes (one in the forefront) towers over the buildings beside the road.
DTL construction site in December 2010
A train arrives at the DTL platform (on the right). On the left is a red wall with signage, station information and maps displayed.
DTL Platform level

During the NEL station's construction, provisions were made for Chinatown station to link with a future MRT line. In October 1997, it was announced that the station would become the terminus of the proposed 12-kilometre (7.5 mi) Marina Line.[24] In subsequent plans, however, the Chinatown branch was scrapped. The project was scaled down to six stations that would form the first stage of the Circle Line (CCL).[25][26][27]

On 26 April 2005, Today reported that soil tests were being conducted around Chinatown station, raising speculations of a possible rail link between Chinatown and Marina Bay via a new developing downtown. However, the LTA expressed they had yet to decide whether to build such a line.[28] On 14 June, the LTA announced that Chinatown station would be the terminus of the Downtown Extension (DTE) from Milennia station (now Promenade).[29][30] The DTE, initially planned to be a branch of the CCL,[31] was revised to be the first stage of the Downtown line (DTL) in 2007.[32]

In preparation for the DTL construction, the utilities underneath Cross Street and Upper Cross Street were diverted into a 500-metre (1,600 ft) long Common Utility Trench (CUT). The 7-metre (23 ft) wide and 3.5-metre (11 ft) deep CUT, located along Pickering Street and Church Street, was constructed using the cut and cover method. The contract for the CUT construction was awarded to Hwa Seng Builder Pte Ltd on 18 August 2006 for S$6.4 million (US$4 million).[33] Contract 909 for the construction of the DTL station and associated tunnels was awarded to Gammon Construction at S$160.3 million (US$106.4 million) in August 2007.[34][35] On 12 February 2008, the LTA held a ceremony at this station to mark the beginning of the DTL's construction.[36]

During the construction, traffic was diverted to Cross Street and Upper Cross Street from March 2007 to the end of June 2008. The area in front of Hong Lim Complex and Chinatown Point had been closed off to build the support wall for the station and tunnels.[37] Subsequently, a section of Upper Cross Street between Yue Hwa Building and Block 34 was realigned from 18 January 2010 until the station's completion in 2013.[38] On 17 January 2013, the then-Minister of Transport Lui Tuck Yew visited the station, where he announced the 2013 Land Transport Master Plan.[39] An open house was held on 7 December 2013,[40][41] before the DTL station commenced operations on 22 December.[42][43] The station was the terminus of the line until the opening of DTL Stage 3 to Expo station on 21 October 2017.[44][45]

Extending the DTL tunnels from Chinatown to Fort Canning station was a challenge, due to the narrow space between two Housing and Development Board (HDB) blocks and the State Court along the route. In addition, the contractors had to divert the Singapore River for the tunnels’ construction.[46] The DTL tunnels had to be stacked to overcome the space constraints.[47] Before deciding on the route taken to cross the Singapore River, 20 other tunnel routes were considered by LTA engineers but were deemed too unsafe or too damaging to the environment or both. The diversion of the river was necessary as tunnelling underneath would risk sinking or flooding. The tunnel boring machine used could be obstructed by debris that remained stuck into the riverbed. There were considerations to dam the river but it would have disrupted businesses and tour boat operations along the river.[48]

The river diversion, which started in 2012, involved removing components of the river embankment, constructing a series of dams, strengthening the soil and excavating a new 40-by-100-by-7-metre (131 by 328 by 23 ft) canal on the river's west bank.[49][50] After the canal was built, part of the original river course was drained and filled with soil for the tunnels' construction. The debris along the tunnels’ routes were removed using piling rigs before tunnelling works commenced.[50] To ensure the construction would not pollute the river (which is connected to the Marina Reservoir), the LTA had to maintain adequate hydraulic flows.[51] After boring through the area, the river was realigned to its original course.[50]

On 9 December 2022, as part of a joint emergency preparedness exercise by the LTA and train operator SBS Transit, security screenings were held at the station. Commuters entering the station were redirected to a set of fare gates near Exits A and G with Exit F closed. Such exercises were conducted to test established response protocols and maintain vigilance for quicker and more effective responses during emergencies and heightened security situations.[52]

Station details[edit]

Location[edit]

Exit C of Chinatown station, a covered glass entrance atop a short set of stairs in a brick plaza. The covered entrance is surrounded by tall buildings in the background.
Exit C of the station

The station is located within the Singapore Chinese ethnic enclave of Chinatown. The NEL station is situated underground between Eu Tong Sen Street and New Bridge Road, while the DTL is underneath Cross Street.[3] The NEL site was chosen to avoid having to demolish the historical shophouses and buildings in the area.[8]

In addition, this station site is closely linked to shopping centres and busy pedestrian areas, such as Chinatown Point, Hong Lim Complex, People's Park Complex and The Majestic.[53] Surrounding landmarks include the religious sites of Buddha Tooth Relic Temple, Masjid Jamae (Chulia), Fairfield Methodist Church, the Sri Mariamman Temple and the Sri Layan Sithi Vinayagar Temple. The station serves public amenities including the State Courts, Family Justice Courts, Chinatown Visitor Centre and the Kreta Ayer Community Centre.[3]

Services[edit]

Chinatown station is served by the NEL and DTL; the official station code is NE4/DT19.[54] On the NEL, the station is between the Outram Park and Clarke Quay stations,[54] with trains running every 2.5 to 5 minutes.[55] On the DTL, the station is between the Telok Ayer and Fort Canning stations,[54] with trains on the line passing every 2.5 to 5 minutes.[55]

Design[edit]

The station has two underground levels and six entrances.[3][56] The NEL station has a length of 281 metres (922 ft) and a depth of 25 metres (82 ft). The station is unusually long, allowing connections to various surrounding places of interest.[53] Alluding to the area's "rich oriental culture", the station is decorated with Chinese calligraphy on the floors of the station platforms and concourse as well as a mural on the wall across the concourse.[56] The DTL station is 450 metres (1,480 ft) long, with plans to connect the station with the adjacent Telok Ayer station via an underground retail link.[57][58]

The NEL station is designated as a Civil Defence (CD) shelter.[59][60] It is designed to accommodate at least 7,500 people and withstand airstrikes and chemical attacks. Equipment essential for the operations in the CD shelter is mounted on shock absorbers to prevent damage during a bombing. When electrical supply to the shelter is disrupted, there are backup generators to keep operations going.[61] The shelter has dedicated built-in decontamination chambers and dry toilets with collection bins that will send human waste out of the shelter.[62]

The NEL and DTL platforms are wheelchair-accessible. A tactile system, consisting of tiles with rounded or elongated raised studs,[63] guides visually impaired commuters through the station,[22][64] with dedicated routes that connect the station entrances to the platforms or between the lines.[65] There are wider fare gates that allow easier access for wheelchair users into the station.[66]

Exit A to Pagoda Street features a pavilion-style transparent roof-structure which provides an unobstructed view of the shophouses and allows natural light into the station.[7][67][68] As Pagoda Street is in a low-lying area vulnerable to flooding, the entrance has a mechanical flood barrier, eliminating the need to elevate the entrance to a level that would obstruct the view of the street. During a flood, water would flow into a chamber underneath the barrier's floor, causing the barrier to rise against the overflow.[69] The other station entrances employ glass structures that allow views of the surrounding developments and natural lighting.[7] The new elliptical entrance serving the DTL station reflects the elliptical façade of the nearby Hong Lim Complex.[70]

Public artwork[edit]

The station displays two artworks as part of the MRT network's Art-in-Transit programme – a showcase of public artworks on the MRT network.[71]

The Phoenix's-Eye Domain[edit]

Open concourse with escalators leading downwards to the platforms and Chinese calligraphic writing on the floor.
Chinese calligraphy on the concourse floor and the mural in the background

Tan Swie Hian's The Phoenix's-Eye Domain is a wall mural representing the journey of Singapore's Chinese immigrants, supplemented by a poem written in three sets of rhyming couplets.[71] The colourful mural, depicting a soaring phoenix in various forms, is displayed at the NEL concourse level, while the poem is engraved on the floors of the station platforms and concourse. The artist intended for the poem to be a "footnote" to the mural, while the mural is supposed to be a visual realisation of the poem.[68][72][73]

Taking inspiration from the description of the mythical phoenix in the Chinese classic text "Shan Hai Jing", the artist uses the phoenix as a symbol of perseverance and strength of the first Chinese settlers. Not intending to just use recognisable depictions of old Chinatown, Tan wished to capture the enduring and noble spirit of the ancestors, who are depicted in the artwork as helping build modern-day Singapore. In the mural, the phoenix flies over the waterfront of Singapore, which is by two kris-shaped rocks. These two rocks, which once existed at the waters' edge, were used as indicators by early Chinese navigators, who referred to Singapore as the "Dragon's Teeth Gate". Written on the phoenix's body are five characters, each with different meanings: Virtue, Righteousness, Civility, Benevolence and Credibility, regarded to be the five core values of man.[68]

In another section of the artwork, the phoenix is shown in its full glory, being surrounded by a myriad of birds. This was intended to be an auspicious sign of Singapore's prosperity. In the last segment of the mural, the birds and phoenix combine into one, symbolising the "universal energy" of the cycle of life.[68][74] The coolies on the mural are depicted as victorious strong men in classical Greek style rather than defeated labourers, as the artist felt the labourers were already well-built. Before the artwork was reproduced in the United Kingdom, Tan first drew out the work by hand. Instead of watering them down via a painting medium, Tan applied oil and acrylic paints directly onto the canvas. This was done to accomplish vibrant colour transitions for the work. However, it was difficult to reproduce this colour treatment when the mural was being produced in the United Kingdom. Through experimentation, the specialist company in Birmingham adopted a seven-colour process to closely match the original's colours on the final artwork in vitreous enamel.[74]

The poetry, composed in a semi-cursive calligraphic script,[72] employs the couplet – a pair of complementary verses set side by side. The calligraphy was first written in ink on rice paper before being scanned onto a computer and reproduced on the 1.2 m2 (13 sq ft) granite tiles. Each of the Chinese characters was cut out from grey slabs and inlaid into slabs of a darker tone, hollowed out for the characters. Placing the work on the floor, however, was considered unusual, as calligraphic works were usually placed on walls in auspicious positions. Tan explained that since life comes from earth, the earth is as auspicious as the sky. The artist intended to lay the characters on the same earth the first settlers had set foot on.[74]

Flying Colours[edit]

Open concourse with stairs leading to the platform downwards and the mural on the left
Flying Colours by Cheo Chai Hiang displayed across the DTL concourse level

The DTL concourse level features Flying Colours by Cheo Chai Hiang.[72][75] The artwork depicts several clothes lines, a scene representing Singapore's high-rise HDB flats. The clothes lines changes slightly when viewed from different angles (i.e. a lenticular print). The artist sought to transform the "mundane" aspect of the scenery into something "festive and celebratory",[70] while creating an illusion of clothes "flying in the wind".[76][77] The angle of the clothes lines directs commuters to the platforms.[78]

The DTL artwork has drawn mixed reactions from other artists. Jeremy Sharma, the artist of Holland Beat at Holland Village station, regarded the work as "original and attractive with a lot of playful humour". On the other hand, Yek Wong, the artist who created the artwork at one-north station, felt that the work did not quite deliver the concept and suggested it could be more "visually engaging".[77]

Notes and references[edit]

Notes[edit]

  1. ^ A bridge built in 1995 that connects New Bridge Road to Eu Tong Sen Street.[12]

References[edit]

  1. ^ "151 New Bridge Road Chinatown MRT Station". OneMap. Singapore Land Authority. Archived from the original on 1 March 2021. Retrieved 1 March 2021.
  2. ^ "91 Upper Cross Street Chinatown MRT Station". OneMap. Singapore Land Authority. Archived from the original on 1 March 2021. Retrieved 1 March 2021.
  3. ^ a b c d e "Train Service Information". SBSTransit. Archived from the original on 1 March 2021. Retrieved 8 February 2020.
  4. ^ Leong, Chan Teik (5 March 1996). "16 MRT stations for 20-km North-East line". The Straits Times. Singapore Press Holdings. p. 1.
  5. ^ "Residents in N-E corridor happy with station sites". The Straits Times. Singapore Press Holdings. 6 March 1996. p. 16.
  6. ^ Jalehahashim (29 June 1997). "Two firms clinch contract for People's Park MRT station". The Straits Times. Singapore Press Holdings. p. 28.
  7. ^ a b c d Leong 2003, p. 72.
  8. ^ a b c Leong 2003, p. 61.
  9. ^ a b c d Leong 2003, p. 68.
  10. ^ Wong, Kwai Chow (7 February 1999). "Thank goodness the crowds are back". The Straits Times. Singapore Press Holdings. p. 6.
  11. ^ a b c d e Lim, Alan; G. Chandradas (31 May 2002). "Chinatown back on track – It will be an even more vibrant hub". The Straits Times. Singapore Press Holdings. p. 4.
  12. ^ a b c Leong 2003, p. 62.
  13. ^ a b Leong 2003, p. 71.
  14. ^ Leong 2003, p. 67.
  15. ^ a b Leong 2003, p. 64.
  16. ^ "Cave-in at MRT work site". The Straits Times. Singapore Press Holdings. 3 July 1999. p. 46.
  17. ^ Chong, Chee Kin (23 November 1999). "Cave-in at Eu Tong Sen Street". The Straits Times. Singapore Press Holdings. p. 1.
  18. ^ Chong, Chee Kin (3 December 1999). "Road trouble again at Eu Tong Sen Street". The Straits Times. Singapore Press Holdings. p. 3.
  19. ^ Yeo, Geradline (8 December 1999). "Road closures due to tunnelling work". The Straits Times. Singapore Press Holdings. p. 3.
  20. ^ "Road re-opens". The New Paper. 20 April 2002. p. 6. Traffic should return to normal today, after more than four years of construction and congestion, because the new Chinatown MRT station was being built.
  21. ^ Loh, Hsiao Ying; Desmond Foo (18 January 2003). "Majestic Theatre's back". The Straits Times. Singapore Press Holdings.
  22. ^ a b "North East Line Opens for Passenger Service!". Land Transport Authority. 20 June 2003. Archived from the original on 3 December 2007.
  23. ^ Goh, Chin Lian (21 June 2003). "It's a smooth ride on NEL – mostly". The Straits Times. Singapore Press Holdings. p. 1. Retrieved 10 December 2021. Minor hitches aside, the North-East Line got off to a smooth start yesterday
  24. ^ Lam, Jenny (16 October 1997). "Plans for new Marina train line are rolling". Business Times. The proposed 12-kilometre (7.5 mi) Marina line... is likely to start from Kallang MRT station,... [joining] People's Park (Chinatown) station [and] there will be a branch running from Marina Centre to the Dhoby Ghaut MRT station.
  25. ^ Yeo, Geradline (25 November 1999). "6 stations for Marina line's first phase". The Straits Times. Singapore Press Holdings. p. 3.
  26. ^ Chew, Marissa (25 November 1999). "Marina rail line to be scaled back". Business Times. p. 3.
  27. ^ "Stage 1 of the Circle Line". Land Transport Authority. Archived from the original on 10 April 2008. Retrieved 10 October 2020.
  28. ^ Tor, Ching Li (26 April 2005). "Chinatown-Marina Bay link on MRT?". Today. Mediacorp. Archived from the original on 6 February 2021. Retrieved 6 February 2021.
  29. ^ Tor, Ching Li (15 June 2005). "Joining the hot spots". Today. Mediacorp. p. 2.
  30. ^ "Expanding The Rail Network With Downtown Extension". Ministry of Transport. 14 June 2005. Archived from the original on 6 February 2021. Retrieved 6 February 2021.
  31. ^ Daryl, Loo (15 June 2005). "Circle Line extension set to liven up New Downtown and CBD". The Straits Times. Singapore Press Holdings. p. 18.
  32. ^ Tan, Christopher (15 March 2007). "Five stops planned for first phase of Downtown MRT line". The Straits Times. Singapore Press Holdings. p. 1. Retrieved 8 November 2022.
  33. ^ "LTA Will Construct A Common Utility Trench (CUT) To Co-Ordinate The Diversion Of Utilities Prior To Downtown Extension Construction". Land Transport Authority. Archived from the original on 30 November 2009.
  34. ^ T. Rajan (3 August 2007). "Downtown Line: Work on 1st stage to start this year". The Straits Times. Singapore Press Holdings. p. 39.
  35. ^ "List of contracts awarded for Downtown Line 1" (PDF). Land Transport Authority. Archived from the original (PDF) on 1 November 2015. Retrieved 21 April 2020.
  36. ^ "Construction Work On Downtown Line Stage 1 Begins" (PDF). Land Transport Authority. 12 February 2008. Archived from the original (PDF) on 15 December 2019. Retrieved 15 December 2019.
  37. ^ "Traffic Diversion Along Cross Street And Upper Cross Street". Land Transport Authority. Archived from the original on 31 December 2013.
  38. ^ "Temporary Road Diversion along Upper Cross Street". Land Transport Authority. Archived from the original on 23 April 2010.
  39. ^ "Speech by Mr Lui Tuck Yew at visit to DTL1 Chinatown Station on 17 January 2013". Ministry of Transport. 17 January 2013. Archived from the original on 26 February 2020. Retrieved 7 February 2021.
  40. ^ "Celebrate "Music Through The Years" at Downtown Line 1 Stations this Saturday!". Land Transport Authority. Archived from the original on 25 April 2016.
  41. ^ "Downtown Line 1 Open House". Ministry of Transport. 7 December 2013. Archived from the original on 1 March 2021. Retrieved 7 February 2021.
  42. ^ Sim, Royston (21 December 2013). "Downtown Line Stage 1 officially opened by PM Lee". The Straits Times. Singapore Press Holdings. Archived from the original on 1 March 2021. Retrieved 7 February 2021.
  43. ^ "Downtown Line Stage 1 officially opened by PM Lee". TODAYonline. Mediacorp. 21 December 2013. Archived from the original on 1 March 2021. Retrieved 7 February 2021.
  44. ^ "LTA | News Room | News Releases | Factsheet: Downtown Line 3 to Open on 21 October 2017". Land Transport Authority. Archived from the original on 22 April 2020. Retrieved 22 April 2020.
  45. ^ Alkhatib, Shaffiq Idris (21 October 2017). "Downtown Line 3 opens to public". The Straits Times. Singapore Press Holdings. Archived from the original on 6 April 2019. Retrieved 20 August 2020.
  46. ^ "Arup clinches top honours at the Building and Construction Authority Awards". Arup Group. Archived from the original on 8 February 2021. Retrieved 8 February 2021.
  47. ^ Wong, Derek (14 May 2018). "Engineers lauded for cutting-edge solutions". The Straits Times. Singapore Press Holdings. Archived from the original on 8 February 2021. Retrieved 8 February 2021.
  48. ^ Feng 2017, p. 44.
  49. ^ Christopher Tan (29 October 2014). "Downtown Line 3 taking shape as Singapore River diversion comes to completion". The Straits Times. Singapore Press Holdings. Archived from the original on 1 March 2021. Retrieved 8 February 2021.
  50. ^ a b c Feng 2017, p. 52.
  51. ^ Feng 2017, p. 47.
  52. ^ "Joint News Release by the Land Transport Authority (LTA) & SBS Transit - Public Transport Emergency Preparedness Exercise at Chinatown MRT Station". Land Transport Authority. 2 December 2022. Retrieved 9 December 2022.
  53. ^ a b Leong 2003, p. 58.
  54. ^ a b c "MRT System Map" (PDF). Land Transport Authority. Archived (PDF) from the original on 21 August 2020.
  55. ^ a b "Transport Tools – MRT/LRT". Land Transport Authority. 6 May 2020. Archived from the original on 1 November 2019. Retrieved 19 June 2020.
  56. ^ a b "North East Line: Chinatown Station". Land Transport Authority. Archived from the original on 3 December 2007. Retrieved 8 February 2021.
  57. ^ "News Room – News Releases – Downtown Line". Land Transport Authority. 21 December 2013. Archived from the original on 31 January 2021. Retrieved 8 February 2021.
  58. ^ "Technical Details". URA. Archived from the original on 24 November 2021. Retrieved 19 October 2021.
  59. ^ "Chemical attack? Clean-up at N-E line". The Straits Times. Singapore Press Holdings. 14 February 2003.
  60. ^ "List of Public CD shelters as of 31 Dec 2019" (PDF). Singapore Civil Defence Force. Archived from the original (PDF) on 3 September 2021. Retrieved 3 September 2021.
  61. ^ Leong 2003, p. 253.
  62. ^ "Fancy that, dry toilets grab most interest". The Straits Times. Singapore Press Holdings. 16 February 2003. p. 21.
  63. ^ "Tactile Guiding System: Studs and Strips to Guide Your Way". Land Transport Authority. 30 July 2021. Archived from the original on 11 September 2021. Retrieved 11 September 2021.
  64. ^ Leong 2003, p. 248.
  65. ^ Leong 2003, p. 249.
  66. ^ Feng 2017, p. 100.
  67. ^ "Getting Around – Public Transport – Rail Network – North East Line". Land Transport Authority. 29 July 2020. Archived from the original on 1 November 2019. Retrieved 8 February 2021.
  68. ^ a b c d Tan 2003, p. 54.
  69. ^ Leong 2003, p. 66.
  70. ^ a b "Downtown Line 1: Art-In-Transit" (PDF). Land Transport Authority. Archived from the original (PDF) on 23 October 2013. Retrieved 16 October 2013.
  71. ^ a b "Getting Around | Public Transport | A Better Public Transport Experience | Art in Transit". Land Transport Authority. Archived from the original on 21 April 2020. Retrieved 11 July 2020.
  72. ^ a b c "Art-in-Transit". SBSTransit. 15 December 2020. Archived from the original on 21 April 2020. Retrieved 22 December 2020.
  73. ^ "NE4 – Chinatown". SBSTransit. Archived from the original on 16 October 2013. Retrieved 16 October 2013.
  74. ^ a b c Tan 2003, p. 57.
  75. ^ "News Room – News Releases – Downtown Line". Land Transport Authority. 21 December 2013. Archived from the original on 31 January 2021. Retrieved 31 January 2021.
  76. ^ "DT19 – Chinatown". SBSTransit. 27 June 2015. Archived from the original on 27 June 2015. Retrieved 3 March 2021.
  77. ^ a b Ting, Lisabel (6 December 2013). "View works on the fast track". The Straits Times. Singapore Press Holdings. Archived from the original on 6 February 2021. Retrieved 31 January 2021.
  78. ^ "Wavin' Colours in the Wind" (PDF). Land Transport Authority. Archived (PDF) from the original on 24 November 2021. Retrieved 19 October 2021.

Bibliography[edit]

External links[edit]